Search This Blog

Friday 17 April 2020

Potain MDT 269 J12 crane with Crane Control System

With certified and reliable components and innovative design, the CCS system allows Potain MDT 269 J12 cranes to hold a new bar in the production of tower cranes. The CCS system continuously monitors and tracks all crane movements and structural loads in real time thanks to an excellent network of redundant sensors. It only takes 15 minutes to set the configuration, calibrate the crane motion sensors, set the trolley limit switch, and set the boom length. After that, the tap will automatically get information about the stop points. It may take more than three hours for cranes that are not equipped with the CCS system to be properly set up and set up.


Since 2016, an updated line of Potain MDT series tower cranes, which everyone has loved, has been launched at Manitowoc factories. A feature of these cranes is to equip the latest Crane Control System (CCS). This option has a positive effect on the performance of the series models, speeds up and simplifies commissioning, and also improves operational safety.

I note that the joysticks on these cranes are modern and convenient for work










No comments:

Post a Comment